Rolls Royce reveals Raynesway site redevelopment plans
East Midlands Railway returns to UK ownership
Nottingham Venues host ‘beam’s Great Supplier’ showcase
Midlands inbound deals hit 15-year high as overseas investment gathers pace
Waste and recycling business secures multi-million-pound funding package to drive expansion plans
6 things business leaders can do to create a safe workplace
trentbarton’s MD retires
Revenue up as profits slip at Travis Perkins in challenging year
Nottingham Trent University research project to give electric vehicle batteries a ‘second life’
Nottingham Trent University (NTU) is part of a £4.5 million research project to establish a process to recycle or reuse electric vehicle batteries to help prevent up to nine million tons of battery waste per year going to landfill.
A £582,000 grant has been awarded to the university’s Advanced Design and Manufacturing Engineering Centre (ADMEC) as part of the European-wide REBELION project which looks to give used electric vehicle Lithium-ion batteries a ‘second life’ or recycle them in a more efficient way.
Research shows that with reconditioning, the majority of electric vehicle batteries would be able to last another ten years after their capacity has fallen below 75 per cent. But the majority are sent to landfill and many of the first generation electric vehicles will soon reach their end of life.
The project – which is supported by the European Horizon programme and incorporates 11 organisations from across Europe – will also establish how recycling electric vehicle batteries could create a major source of Lithium-ion on the continent.
The main aims of the project include developing:
- Technology to sort used batteries into those suitable for a ‘second life’ and those which should be recycled
- Automated methods to dismantle batteries so that they can be recycled more efficiently
- A safety protocol for the recycling and reusing process and designing safety box containers for safe battery transportation and storage
- A standardised labelling system to provide data on second life batteries
- An analysis of how well the proposed models of recycling and repurposing perform
- A roadmap to the market for individual and joint business models
The NTU team will develop the information communication technology (ICT) platform and infrastructure. The team will also develop methods in relation to traceability of batteries, digital battery passports, ecolabelling and the calculation of eco-cost and eco-savings.
The team will also contribute to repurposing second life batteries in lighting products.
Partners in the project include Universitat Politechnica de Valenica, Accurec-Recycling, Sig de Raee Y Pilas Sociedad Limitada, Ona Product SL, Universidad Nacional de Educacion a Distancia, University of Birmingham, Fondazione Icons, Erion Energy, Erion Compliance Organization Scarl and Volkswagen Group Italia SPA.
Professor Daizhong Su, head of ADMEC which sits in NTU’s School of Architecture, Design and the Built Environment (ADBE), said: “With the increased volume of electric vehicle batteries coming towards their end of life, it’s imperative that there’s a quick and accurate way to predict a battery’s future life in order to maximise second-life applications.
“Recycling is the most environmentally-friendly way to deal with batteries after their second life and has the potential to turn them into a major economic resource in Europe, with a value of up to £23 billion per year, as the raw materials they contain can be used for further manufacturing.
“This is an exciting project which has the potential to make the electric vehicle industry even more sustainable and help prevent up to nine million tons of battery waste per year going to landfill by 2040. We look forward to working with our partners to help create sustainable solutions for many of the future challenges of the electric vehicle industry.”
G F Tomlinson supports local Nottingham community with access to central sanitation facilities
As part of the company’s commitment to delivering social value, Midlands contractor, G F Tomlinson, has supported Arena Church to deliver sanitation facilities at its Nottingham City Centre premises, which will be open in the near future.
The church, which is based on Western Street in the Hockley area, currently provides refuge, shelter and hot refreshments for vulnerable Nottingham residents who need it most.
G F Tomlinson has worked with local sub-contractors alongside pastor, Jono Kirk, from Arena Community to convert previously unused space into a shower and washer / dryer facility for vulnerable Nottingham residents to use who lack access to basic sanitation facilities.
The vital additions will act as an extension of Arena Church’s mission to ‘Go, Grow, Love and Serve’ in Nottingham City, and facilities will be on hand ready for when the church launches its new ‘Care for a Coffee’ initiative once funding is secured.
‘Care for a Coffee’ will provide warm, safe spaces for vulnerable people to get a weekly hot meal, with an option to clean and dry clothes and make the most of a ‘shower hour’.
Kevin Dodds, construction director at G F Tomlinson, said: “We are great advocates of the work that Arena Church do for the local area, and are proud to have been involved in the delivery of vital sanitation facilities in the building, helping to support vulnerable communities.
“We hope those who need it most are reassured that there is a safe space where they can spend time, have a hot meal and use the shower and washing facilities.”
Jono Kirk, pastor at Arena Church, said: “We at Arena Church, Nottingham are so thankful for the work that G F Tomlinson and all subcontractors have carried out, transforming previously unused space to make an incredible difference to the lives of people with no access to such facilities.
“We believe this will act as a springboard in Arena Church Nottingham’s mission to serve the city and will really help in bringing our new ‘Care for a Coffee’ vision to life. Without G F Tomlinson and all they have done, this wouldn’t be possible. A big heartfelt thank you to all involved.”
G F Tomlinson recruited the services of Prime Flooring Solutions, Amptron Electrical Services, Browns Builders Merchants, and SV Timber to work alongside them to deliver the works at Arena Church, which started in mid-January and completed in February.